TEXT_SIZE
[ Reset ]

Tenders

 

Closing Date
 
Tend            er/ RFQ
Details
September 6 @ 2:00 p.m.
The work includes:
Approximately 50 metres of roadworks, including asphalt removal, excavation, granular placement and regrading of the roadside embankment to achieve a stable embankment.
The construction of approximately 350 metres of asphalt curb and gutter, outlets and spillways.
Restoration of the site upon completion of the Work.